Stable Conversion – April 2010

Stable Conversion and refurbishment at The Old Stable B & B. Procurement – competitive Tender Upon winning the tender for this project GMC were consulted by the requirement of the client on the importance of this project being completed to coincide with the beginning of the local tourist season. We took this on board and…

Read More

New Double Garage – June 2010

Our GMC design team came up design options for the client to choose. Then proceeded with planning and building control application. Finished with a polished concrete floor, natural slate roof, natural stone walls and electrically operated garage door. The GMC team completed these works with minimal disruption to the family property.

Read More

Home Extension – March 2010

GMC have recently finished a private home extension in the Berwick area. Using the GMC procurement method the client was in complete control of budget at all times, with the GMC team taking care of all the details. Once the Design team had finished and the client was happy with the project plan and budget.…

Read More

Wood Burning Stove Installation – Sept 2010

With Winter on its way, GMC have been busy installing Wood/Multi burners across the borders. They are proven as exceptionaly efficent sources of heat for your home. Burning at over 80% effeciency compared to around 40% for an open fire. The Example above required the removal of an un-efficent open gas fire place and the…

Read More

Former Mill Refurbishment – Aug 2010

Start : August 2010 Procurement : Competitive Tender GMC have begun an extensive re-furbishment of a former Mill. Including some major structural work. Major slappings through solid masonary walls Gable wall re-staining Chimney re-build Along with this work is a complete internal re-furbishment and room re-alinement.

Read More

Home Alteration/Extension – Sept 2010

Brought in at design and conception stage of this project. GMC guided the client through the whole design, planning and building control stages of the project before starting on site 8 months after the initial consultation. This whole process was completed while the clients were in Quebec Canada! GMC have started on site and are…

Read More

Solar Photovoltaic 3.9KW/h – March 2011

Berwick Area 16 X 245W Sharp Monocrystaline modules 1 X Diehl Ako Platinum 3800 S Inverter Click fit mounting System This system is expected to produce more than 2,925KW/h per annum and produce in the region of £1,600.00 worth of income and savings on electricity costs to the customer. The cost of this system was…

Read More

Solar Photovoltaic 2.4KW/h – March 2011

10 x 245W Sharp Monocrystaline Modules 1 x SMA SB2500 Inverter Click fit mounting System   This system was fully mounted by 2 GMC roofers in 5 hours and fully comissioned and producing electricity by 3pm the same day. The inverter is located in the attic above the garage with only total generation meter and…

Read More

Home Extension – April 2011

GMC Have recently Competed a Home Extension in the local Area. Procurement – Competitive tender Build – Timber Frame After securing this project through competitive tender, GMC began on site working along side the apointed Architect and with the client to drive the project forward. With the build being timber frame, it suited our work…

Read More

New Front Porch – May 2011

GMC have just finished a small porch extension in Berwick upon Tweed. GMC were brought in at design stage to carry out the design process. The design was comlpeted so it would fall under ‘permitted development’ and therefore not be subject to planning permission. Building regulations did apply however and GMC acted as agent for…

Read More